Hatch fitting and the Galley Continues

27/11/2026 1 By Chris Phillips
Goodbye, Fair Prince, but good riddance to your owners

I finally made my escape from Prince Madog on 1st December – and I say finally because it will be the last time I go anywhere near that vessel under the current management. It could have been such a good job, and I actually enjoyed the short period of work we did with Bangor University, but the managing company proved to be toxic, displaying behaviours across the board which I simply refused to tolerate. Fortunately, another opportunity opened itself up almost concurrently with my leaving the ship, upon which I shall enlarge in due course, when everything is signed and sealed. In the meantime I have awarded myself December off, so I can actually have a proper Christmas this year, and crack on with the boat, so this is probably going to be a slightly shorter, half-time update, written whilst visiting parents and friends down south. I shall be returning home on Monday and will get straight back to work with Serchthrift as soon as I can, as things are really starting to take shape in an exciting way!

Last time I wrote, I had built the main body of the sliding companionway hatch, and had made a good start in fitting out the galley, and these have continued to be the main focus of my efforts over the past few weeks. Work has been a little disjointed, as I have also had some distractions at home, with a whole new array of solar panels and storage battery being fitted to the house, so some of my time has been spent dealing with the various contractors for that, as well as dealing with my job applications, etc.

Firstly, the hatch. I had planked the hatch lid with some reclaimed teak deck planks before I left to go back to sea, and was awaiting delivery of the brass sliding rails, which I had previously misordered – an expensive mistake as I could not return the incorrect brass lengths because they were custom cut, and carriage for 1.2m strips of brass to the Highlands and Islands ain’t cheap. The new rails had arrived by the time I got home, so I was able to progress to the next stage of the hatch build. So far, the hatch cover consisted of an inner frame (15mm teak), a laminated and glassed top, planked with the aforementioned teak. The next stage was to temporarily screw the brass rails on top of the teak rails on the doghouse roof, so I could get the dimensions correct for the substantial teak side pieces on the hatch lid. These were cut from 1″ teak leftovers from some of the reclaimed lab worktops, and this was milled to size and fitted temporarily to the sides of the hatch cover. From this I marked the position of the slot that would be cut on the inside faces of these side pieces, which houses the brass rail. In order to get this exactly right, I also fitted the brass strips to the bottom edges of the inner hatch frame. These are designed to mate exactly with the strips on the rails and coamings on the doghouse roof, providing a slippery surface upon which the hatch will slide, but also hopefully a flat sealing surface for when the sliding hatch is dogged down (an unusual feature for a sliding hatch, but belt and braces for high-latitude sailing). These strips were bedded in polyurethane adhesive sealant (CT-1) and screwed at regular intervals to try to keep them as flat as possible, and watertight.

The position of the slots having been marked and double-checked, the slots could be cut by running the boards over the table saw repeatedly, widening the kerf on each pass by shifting the fence by 1mm or so each time, until it was wide enough for the 3mm brass strip with a bit of slack to allow for irregularities. These side pieces were then dry fitted again to the hatch, and the sliding motion checked to ensure there was no sticky bits. There were – but these were due to the squeeze-out of CT-1 from under the brass rails, not the miscutting of the slots, so I cleaned up the mess and the hatch slid much better afterwards. Before glueing the side pieces onto the hatch, I needed also to cut matching trim pieces for the forward and aft faces of the hatch. The forward face needed to be shaped to match the camber both of the hatch cover on the top edge, and the doghouse roof on its bottom edge, and this piece would be a snug fit around the rails and down to just clear the doghouse roof, preventing as much as possible any water ingress from waves and spray coming from forward. Any water which does get through should only get as far as the cofferdam between the twin forward coamings, and drain harmlessly through the limber holes in the hatch rails either side. This forward trim piece would be glued onto the hatch and form an integral part of the hatch structure. The aft end would have to be treated slightly differently, as the lower part, which projects down below the join between hatch and coamings has to be removable, in order for the hatch to be able to be slid off the rails for maintenance. I therefore made the trim in two pieces – the top would be glued to the hatch, and the lower part, again profiled to match the camber of the hatch top, would be screwed in place. This lower piece will also incorporate a lip for the seal with the vertical folding hatch boards, which are yet to be constructed. Once these pieces were cut and shaped to form a neat join with the side-pieces, the whole lot could be glued and screwed in place. Once the glue had cured and was cleaned up, I planed the upper edges to match the camber, and then rounded all the edges of the hatch, to be more hand-friendly. Then came the messy job of caulking all the seams between the planks. This entailed masking all the wood, leaving just the seams exposed, then squeezing ridiculous amounts of CT-1 into the seams. Of course, I had completely underestimated the amount of poo required to fill the seams, so I ran out halfway. Panic ensued, and I rushed off in the car towards Oban, hoping I could get some more somewhere, knowing that Screwfix only had OB-1, which is equivalent, but not the same as CT-1. Highland Fasteners stocks CT-1 but it was a Saturday afternoon by now, and they closed at lunchtime. Just as I was coming into Oban, I remembered that I thought I had seen CT-1 in the Alba Sailing chandlery at Dunstaffnage Marina (just outside Oban to the north), so I called them as I drove on through Oban just to check, and fortunately they did stock it. My panic subsided and I was able to pick up a couple of tubes there and get back to Kilmelford before the first batch had cured, ensuring a good contiguous join. I finally had all the seams pooed, and ran a small filling knife over them all to ensure the poo was well squeezed in and that there would be minimal sanding to smooth off the excess once cured. I resisted all temptation to pre-empt curing, and left the hatch overnight before removing the masking tape to reveal a very satisfactory result. The whole top was then sanded first with the belt sander, to bring down any excess sealant, and then finally with the palm sander to finish.

The whole assembly could now be taken back up onto the boat and test-fitted to the rails. Of course, everything having been glued and screwed nice and tight, there were some very sticky spots sliding to and fro on the rails, so I had to identify where it was sticking, and why, before repeatedly taking the hatch off, back down the ladder to the workbench and trimming, sanding or tweaking where necessary until the hatch slid freely on the rails. This exercise was made more fun as the previously lightweight structure had put on a considerable number of extra pounds since adding the sides and outer trim, so was a pretty hefty thing to lug repeatedly up and down the ladder! Somehow I’ve never got round to investing the time, money or effort required for proper steps, and sometimes regret it!

Having got the hatch to this stage, I paused hatch work whilst I ponder the final design for the hatch boards, and procure the necessary hardware, and got back to the galley.

The next stage of the galley project was to construct the rest of the framework and structure for the cabinetry. Working from the datums provided by the existing structures (fridge / food locker cabinet, bulkheads and engine box), I started measuring up and cutting first the softwood framework for the worktop and across the back of the cooker aperture. This involved a fair amount of head-scratching in order to ensure the space left for the cooker was exactly right, and that there would be enough support in the structure for the weight of the cooker hanging in its gimbals, followed by a lot of cutting of half-lap joints so the structure all slotted together nicely.

This stage completed, I then started to shape the hardwood door frame for the undersink locker (in the aft leg of the ‘U’ shape), which needed to be profiled to fit snugly to the sloped sole boards, and then a similar frame for the cooker aperture and the locker under the cooker, joined to the undersink locker with a nice hardwood board, and finished with a part-bulkhead to fill the gap to the hull lining, forming the aft face of the cooker aperture. Meanwhile I also had to finalise the position for the pressurised fuel tank for the (paraffin) cooker, which will be tucked outboard of the undersink locker, and incorporated a shelf with custom cleating to hold the bottom of the tank, and an upper support to take a strap for securing it in place. All this was then painted with the standard paint scheme of 2 x primer and 2 x grey locker (garage floor) paint, leaving the hardwood bare of course for later varnishing.

With a little time left before I came south, I was able to build the three locker doors for these lockers, using the usual formula I have developed of 20mm hardwood rails and stiles and a 6mm ply door panel. The rails and stiles I normally cut to 60mm wide (from a 90mm board, leaving a convenient offcut from which fiddles can later be made), but for the locker under the cooker, because it is wide and shallow, I used lengths of my standard 45mm wide hardwood carcassing for the rails so the door does not look too heavily-framed. These hardwood parts are profiled with rail and stile bits on my big router (mounted in the router table), and usually fit nicely together without too much need for trimming or bodging any bad fits. Occasionally I manage to put one piece through the router the wrong way up, so you end up with a locker door which only M C Escher would be able to assemble, resulting in the frustrating waste of a nice bit of wood (although usually these are able to be reused elsewhere) and some choice language whilst making a new piece correctly.

Whilst down south, I am of course in the land of prolific numbers of chandleries, so I have been doing some shopping for various bits I needed, as well as some I didn’t. I am slowly building up the hardware and fittings I need to finish fitting out the deck, as well as some stuff for the galley water systems (fresh and seawater), and a nice reclaimed oil lamp for the saloon. I also had a fruitful visit to the Chandlery Barge at Bursledon, to whom I managed to sell one of my crates of random cleats and deck fittings which came with the boat when I bought her, and which I had established would not be needed for fitting her out. I have another crate at home which contains stuff which may yet be useful! Finally, I have taken delivery of some sheet stainless steel, which I got from my normal metal supplier, but had delivered to my Mum’s home in order to slash the carriage costs (from £70 ish for Highlands and Islands, to £18 ish to Gosport!).

I shall be back up in Scotland next week, so galley work will continue, as well as most probably making a start on the main hatch boards.